After you buy enough Gantry Bin, you don't know how to install it. Today, I will introduce it to you:
1. Buried
Directly bury garbage bins, fruit peel boxes and other sanitation products. During production, we will reserve a certain length at the bottom, square tubes or sheet metal parts. This can be designed according to the style of the garbage bin or the customer's requirements. Reserve This piece can be directly buried in the mud or concrete floor.
2. Pre-buried
The components that are buried before the concrete is poured and tamped, the components are composed of metals such as steel bars or square pipes. The buried components will be reserved on the upper layer of the concrete to connect with the 3-square garbage bin, screws or expansion screw holes, etc. After the cement dries, you can attach the trash can.
3. Expansion screw fixation
Expansion screws link recycling bins or smart waste bins and other products. This fixing method requires first pouring the cement floor and waiting for the cement floor to dry. The installation method is more flexible, as long as it is a cement floor, it can be fixedly placed.
Fourth, direct delivery
Direct placement refers to the garbage bin to a fixed place, as long as it is placed directly on the ground, no other operations are required, this method is more suitable for large garbage bins in the garbage room, etc. It needs a certain weight and will not be easily blown by strong winds Walk.